CERAMIC MBBR First installed Ceramic MBBR in Middle East Simple plant design and very easy operation since 2011
CERAMIC EQUIPMENT DESIGN
PLANT PICTURES
CLEANING
PLANT KEY DATA
RELATED VIDEOS
> Standard Backwash > Standard Air-scouring    during Filtration and    Backwash > CEB & Sprinkler Hypo    on-air (on demand) > CEB & Sprinkler acid    on-air (on demand) > Annual CIP
> Location: Jeddah    (Kingdom of Saudi Arabia) > Start-up 10/2011 > Moving Bed Biofilm    Reactor with Kaldnes®    carrier media > Filtered water fully    disinfected suitable    for irrigation & firefighting    purposes > Up to 300 m³/d > COD/BOD < 50/10 ppm
MORE ABOUT
PROCESS FLOW DIAGRAM
Filtration Train Design > Installation into 2 concrete basins > 3 Filtration Towers each with 13 modules per basin   (6 towers in total)  
Single Filtration Towers T-Series > Since 2007 in standard portfolio of ItN Nanovation AG  
Filtration Module T-Series (2009 invention by ItN Nanovation AG) > Multi Plate Water Collector with single component    complete membrane potting and internal module    piping connections
Source: Published poster Exhibition SWPF 2015
All About Ceramic Flat Membranes
Last update: 12/2017
© 2015
Source: Published poster Exhibition SWPF 2015